Photos from inspection of the new apartment complex in Maldives capital Male'. The contractor requested that inspections be done on two consecutive days, one inspection for the second floor slab of the north block and the other inspection for the foundation of the southern block. Naturally, I grabbed a camera and rushed to the site.
Gaakoshi flat inspection 3 and 4 Is original article written, if you find that Gaakoshi flat inspection 3 and 4 is violating DMCA please don't hesistate to contact me http://wp-zone.blogspot.com/2011/11/gaakoshi-flat-inspection-3-and-4.html, and Thank For Visit Wallpaper Zone.
No comments:
Post a Comment